Scottish Wind Farm Sites

Location: Multiple sites across Scotland 
Service: Topographical Surveys, Underground Utilities Surveys (PAS 128:2022)

Sector: Commercial | Energy

As built topographical and utilities surveys of ten wind farm sites across the Highlands and Central Belt of Scotland.

Surveys included all significant features on site, including turbine towers, substations, control buildings, and boundaries. Utility surveys captured the alignment of all underground electrical infrastructure.

Interlocks successfully captured all data required in the face of adverse weather and challenging access to remote sites. The Interlocks team managed site access and liaison with asset managers, delivering equipment and personnel safely and efficiently. 

The Scottish Government reaffirmed its commitment to onshore wind in February of 2026 with the auction of 21 new sites to provide 1.1 GW of power. With offices in Edinburgh, Interlocks Surveys is ideally placed to deliver all kinds of survey work associated with the development of new wind farm infrastructure across the length and breadth of Scotland.

Wind farm in Eaglesham, Scotland showcasing renewable energy and sustainability.
I wanted to take a moment to share some very positive feedback regarding Jamie, currently supporting the works at Westbury Viaduct. Since joining the team, Jamie has made a noticeable and genuinely positive difference. His proactivity, strong work ethic, and engaged communication with the client have all stood out. He has integrated quickly and effectively into the team, and his approach has already helped strengthen collaboration on site. I felt it was important to highlight the value he is adding, and to let you know that his contribution is very much appreciated. We look forward to continuing the momentum as we progress with the successful installation of the parapets. Thanks again, and please pass on our appreciation to Jamie.
Jose Segovia
FC Civil Solutions (Ferrovial)
Thank you for this – and I appreciate your quick turnaround from our late request, and many thanks to Alyx for his work on site!
Steven Jewell
MiTek
Thank you for all your and the teams’ efforts in getting such great packages of drawings to us! Really appreciated it.
Caroline Edwards
Acanthus Clews
The survey data we received last night was exactly what we needed. It showed us that the existing access road doesn’t match our construction drawings, which is a significant find for us. Thanks again for managing to rearrange your schedule; it’s really helped us stay on track with our tight deadlines.
​​​​​Tom Gardner
YMD Boon Ltd (Architects)
Your drawings were exemplary and equal to those of another survey firm in quality.
Henry Sanders
Hestia Architects Ltd
Just want to say thank you to the surveying team for the professional and efficient way they carried out the onsite topographical survey at our site.
Steve Blacker
Stansgate Planning
I am more than happy to vouch for the quality and timeliness of Interlocks Surveys work at St Bartholomew’s Hospital and can confirm that their ways of working were appropriately considerate of the nature of St Barts as a Grade I listed heritage asset.”
Ian Haig
Barts Heritage (NHS)
That is excellent thank you. Thank you and the team for your hard work on this. I appreciate it was a whopper of a project to get done given the sheer scale of the site and all the off site highways to considered.
Lauren White
Hallam Land
Swan have been very happy with the service and prices from Interlock.
Tim Major
Swan Environmental