Milton Keynes
Interlocks carried out a CCTV survey of the drainage system, unobtrusively identifying the source of the blockage.
A selection of recent case studies:
Interlocks carried out a CCTV survey of the drainage system, unobtrusively identifying the source of the blockage.
The client required detailed measured building surveys of several cultural assets to show details of complex timber structures.
The Client required over 200 River cross sections over 3 rivers for flood modelling along with threshold levels of some 500 private properties and businesses.
The client required Interlocks Surveys to compile and send out full tender documents for companies to tender for the work.
The client required a topographical survey from the low tide position on the beach through the site to the proposed housing position of the gas line within the terminal.
We work all across the UK and abroad. Search your location or browse the map to see where we worked in 2024.